Tag Archives: projects
LATEST NEWS………..

LATEST NEWS………..

DMJ DRAINAGE LTD Latest News……………   DMJ Drainage Puchases New Mastenbroek CT-12 We have purchased a brand new Mastenbroek CT-12, replacing the previous version that we had for around 8 years.  Due to the reliability and functionality of this machine, we found it very difficult to consider anything other than replacing it with a new [Read More...]

Leave a comment Continue Reading →
Ditch Maintenance at site in Theddlethorpe

Ditch Maintenance at site in Theddlethorpe

Ditch Maintenance required at site in Theddlethorpe Location: Theddlethorpe, Lincolnshire Date: November, 2011 Duration: 1 Day Equipment: Volvo EC140 360 excavator Description: DMJ Drainage LTD were asked to carry out 300 metres of Ditch Maintenance.  The current ditch had deteriorated over the years and had insufficient depths to sustain adequate land drainage depths in the [Read More...]

Leave a comment Continue Reading →
Agricultural Land Drainage at Waldersey Farms

Agricultural Land Drainage at Waldersey Farms

Agricultural Land Drainage at Waldersey Farms Location: Waldersey Farms, Norfolk Date: September 2011 Duration: 10 Days Equipment: Mastenbroek 30/20, Cat Challenger with Stone Cart, Volvo EC140. Description: DMJ Drainage LTD were assigned the Land Drainage Schemes on the Waldersey Farms estate.  Works were completed in order to correct massive drainage problems the client was experiencing [Read More...]

Leave a comment Continue Reading →
Agricultural Land Drainage at Stainsby

Agricultural Land Drainage at Stainsby

Agricultural Land Drainage at Stainsby Location: Stainsby, Lincolnshire Date: August 2011 Duration: 4 Days Equipment: Barth K171, Tractor Wheeled Stone Cart, JCB 3CX Description: DMJ Drainage LTD were asked to carry out Land Drainage works to a large field in Stainsby. Nearly 3000 metres of 80mm UPVC pipe was used to complete the scheme.

Leave a comment Continue Reading →
MAYBOLE TO GIRVAN GAS PIPELINE

MAYBOLE TO GIRVAN GAS PIPELINE

Pre-Construction and Post-Construction Land Drainage for the Maybole to Girvan 250mm dia. Reinforcement Pipeline Location: Between Maybole and Girvan, Ayrshire, Scotland Date: May to August 2011 Duration: Pre-Con 5 weeks, Post-Con 5 weeks. Equipment: Mastenbroek 30/20, 360º Excavator, 2 x LD1000 Tracked Stone Carts, Mastenbroek CT-12 Description: DMJ Drainage were assigned to carry out both [Read More...]

Leave a comment Continue Reading →
REMEDIAL LAND DRAINAGE

REMEDIAL LAND DRAINAGE

Land Drainage required at Pasture Hill Farm. Location: Pasture Hill Farm, Edenham Date: July 2011 Duration: 1 week Equipment: Barth K171, JCB 3cx, New Holland Tractor with Stone Trailer and Blade. Description: DMJ Drainage were assigned to complete the remedial Land Drainage works associated with a Gas Pipeline.

Leave a comment Continue Reading →
HOLE HOUSE FARM GAS PIPELINE

HOLE HOUSE FARM GAS PIPELINE

Pre-Construction and Post-Construction Land Drainage for Hole House Farm 900mm dia. Reinforcement Pipeline Location: Between Warmingham and Wheelock, Nr Sandbach in Cheshire. Date: Summer 2011 Duration: Pre-Con 3 weeks, Post-Con 3 weeks. Equipment: Mastenbroek 30/20, Barth K171, 360º Excavator, 2 x LD1000 Tracked Stone Carts Description: DMJ Drainage were assigned to carry out both the [Read More...]

Leave a comment Continue Reading →
WEST – EAST LINK MAIN WATER PIPELINE

WEST – EAST LINK MAIN WATER PIPELINE

Pre-Construction and Post-Construction Land Drainage for the West-East Link Main Water Pipeline, connecting Merseyside and Greater Manchester. Location: Between Prescott Reservoir Merseyside, to Woodgate Hill Reservoir in Bury Date: Completed 2011 Duration: 3 Year Contract Equipment: Mastenbroek 30/20, Barth K171, 360º Excavator, 4 x LD1000 Tracked Stone Carts, Mastenbroek CT12 Description: DMJ Drainage were assigned [Read More...]

Leave a comment Continue Reading →
Installation of replacement toe drain

Installation of replacement toe drain

Installation of replacement toe drain along the side of the reservoir at Reevesby Location: Revesby Reservoir, Lincolnshire Date: July 2011 Duration: 1 Week Equipment: 360º Excavator, Mastenbroek CT-12, JCB 3cx, Mini-Digger Description:DMJ Drainage were assigned to replace an old toe-drain, running along the side of the reservoir. The old scheme had failed over the years [Read More...]

Leave a comment Continue Reading →