Pre-Construction and Post-Construction Land Drainage for Hole House Farm 900mm dia. Reinforcement Pipeline
Location:
Between Warmingham and Wheelock, Nr Sandbach in Cheshire.
Date:
Summer 2011
Duration:
Pre-Con 3 weeks, Post-Con 3 weeks.
Equipment:
Mastenbroek 30/20, Barth K171, 360º Excavator, 2 x LD1000 Tracked Stone Carts
Description:
DMJ Drainage were assigned to carry out both the Pre-Construction and Post-Construction Phase of the 3.75km Gas Pipeline that Murphy Pipeline Ltd completed on behalf of National Grid. The Land Drainage works were completed to plan and within time and budget.
HOLE HOUSE FARM GAS PIPELINE
HOLE HOUSE FARM GAS PIPELINE
[img title="VLUU L200 / Samsung L200" alt="VLUU L200 / Samsung L200" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire1.jpg"][img title="" alt="" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire10.jpg"][img title="" alt="" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire11.jpg"][img title="" alt="" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire12.jpg"][img title="VLUU L200 / Samsung L200" alt="VLUU L200 / Samsung L200" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire2.jpg"][img title="VLUU L200 / Samsung L200" alt="VLUU L200 / Samsung L200" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire3.jpg"][img title="VLUU L200 / Samsung L200" alt="VLUU L200 / Samsung L200" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire5.jpg"][img title="VLUU L200 / Samsung L200" alt="VLUU L200 / Samsung L200" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire6.jpg"][img title="VLUU L200 / Samsung L200" alt="VLUU L200 / Samsung L200" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire7.jpg"][img title="VLUU L200 / Samsung L200" alt="VLUU L200 / Samsung L200" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire8.jpg"][img title="" alt="" src="http://dmjdrainage.co.uk/wp-content/flagallery/hole-house-farm-gas-pipeline/thumbs/thumbs_recent-project-1-cheshire9.jpg"]



